LOCATION: SARAWAK RIVER, KUCHING, SARAWAK SCOPE: INTEGRATED GRATING WITH CHECKERED PLATE WITH STEEL STRUCTURE FOR PEDESTRIAN BRIDGE COMPLETED: 2019